Electrical help · Clear arrangements085-4016034Call to check availability
Menu
Wiring and power

Power for equipment with higher demand.

Planning workshop or business equipment that needs three-phase power? Share its technical requirements and where it will be used so the installation can be assessed.

  • Equipment specifications
  • Available supply and protective devices
  • Cable route and connection point
Illustrative electrician and service van outside a home
Clear arrangements before work beginsWe confirm your address, timing and costs with you.
Call to check availabilityDiscuss costs before workService throughout the Netherlands
Describe what you see

When might you need this service?

You do not need to diagnose the installation yourself.

01

Workshop machinery

02

A business installation is changing

03

A higher-power device is planned

What the electrician checks

Understand the work before you agree.

01

Equipment determines the design

The required power, connection type and existing supply govern the work. An electrician can assess the installation and explain the preparation needed.

02

Define the whole route

Separate work at the fuse box, the cable route and the final connection point. If a supply change by the grid operator is needed, its scope and timing are distinct.

For homes in the Netherlands

Connect the electrical plan to your renovation

Share a room plan, expected equipment and when walls or floors will be open. In a rented home or apartment, arrange permission and access to shared spaces before booking fixed electrical changes.

Ask what is included in cable routing, testing and making good after the work.

Start with a few details

Describe the job in plain English.

Tell us what you see, where the work is and how we can reach you. You do not need to choose a technical solution before contacting us.

Send your request

A request is not a confirmed booking.

Prepare your request

These details are useful.

  • Technical data for the machine
  • Proposed location
  • Current supply details if known

In a rented home or apartment?

Tell your landlord or property manager about a fault and check who can approve changes to fixed wiring. Mention access to a shared meter room or parking area where relevant.

Find your town
Know what you are agreeing to

Ask for the full cost before work starts.

The price depends on the fault or installation, materials, labour and timing. Describe your situation so we can discuss the relevant charges before you confirm a visit.

How costs are discussed
01

Visit and diagnosis

Ask about a call-out charge and fault finding.

02

Labour, materials and VAT

Ask for the expected total, including applicable VAT.

03

Urgent or additional work

Check possible evening or weekend charges, and agree to extra work first.

04

For this particular job

Distance, materials and fuse box changes influence cost. Clarify any grid operator work and planned interruptions for your business.

Send the job details
Questions

Questions about three-phase power installation.

You can call if your situation is different.

Can my premises stay open during the work?

Tell us which processes must continue. Access and necessary power interruptions should be agreed before work is scheduled.

Do I need to know what caused the problem?

No. Tell us what stopped working, when it started and whether it affects a room or the entire property. Do not open the fuse box or try to repair exposed wiring yourself.

Is my online request a confirmed booking?

No. We contact you to discuss the job, expected timing, availability and costs. An appointment is confirmed only after you agree.

I rent my apartment. Who should I contact?

You can describe the problem to us, but also tell your landlord or property manager. For work in shared parts of a building, access and permission may need to be arranged.

Need help with three-phase power installation?

Call to discuss urgent help, or send a request for planned work. We will explain the next step.

Call nowRequest help