Planning equipment with higher demand
Prepare your installation for more capacity.
New equipment may require a three-phase supply. We can discuss what must be assessed and prepared inside your property and how to coordinate the next steps.
- Existing supply details
- Fuse box and wiring
- Required changes and responsible parties
An enquiry is not a confirmed appointment. We discuss the work and costs first.

When might you need this service?
You do not need to diagnose the installation yourself.
Changing the property supply
Checking whether the installation is ready
Understand the work before you agree.
Assess the property installation
The fuse box, protection, wiring and supply details all matter. Work on sealed grid operator equipment is a separate responsibility.
Get the sequence right
Agree which preparation is needed before equipment arrives and which work depends on the grid operator or another party.
Connect the electrical plan to your renovation
Share a room plan, expected equipment and when walls or floors will be open. In a rented home or apartment, arrange permission and access to shared spaces before booking fixed electrical changes.
Ask what is included in cable routing, testing and making good after the work.
Describe the job in plain English.
Tell us what you see, where the work is and how we can reach you. You do not need to choose a technical solution before contacting us.
Send your requestA request is not a confirmed booking.
These details are useful.
- Specifications of the planned equipment
- Current supply information if available
- Desired timing
In a rented home or apartment?
Tell your landlord or property manager about a fault and check who can approve changes to fixed wiring. Mention access to a shared meter room or parking area where relevant.
Find your townAsk for the full cost before work starts.
The price depends on the fault or installation, materials, labour and timing. Describe your situation so we can discuss the relevant charges before you confirm a visit.
How costs are discussedVisit and diagnosis
Ask about a call-out charge and fault finding.
Labour, materials and VAT
Ask for the expected total, including applicable VAT.
Urgent or additional work
Check possible evening or weekend charges, and agree to extra work first.
For this particular job
Assessment, property-side preparation and possible grid operator work have different scopes and costs. Ask for each to be clear.
Send the job detailsQuestions about three-phase connection preparation.
You can call if your situation is different.
Does induction cooking always require three-phase?
No. It depends on the hob and existing supply. Have the appliance specifications checked.
Do I need to know what caused the problem?
No. Tell us what stopped working, when it started and whether it affects a room or the entire property. Do not open the fuse box or try to repair exposed wiring yourself.
Is my online request a confirmed booking?
No. We contact you to discuss the job, expected timing, availability and costs. An appointment is confirmed only after you agree.
I rent my apartment. Who should I contact?
You can describe the problem to us, but also tell your landlord or property manager. For work in shared parts of a building, access and permission may need to be arranged.
Need help with three-phase connection preparation?
Call to discuss urgent help, or send a request for planned work. We will explain the next step.